“Versatile commitment requires broad knowledge” Warande is an organisation that provides living accommodation, service and care for senior citizens. In order to provide this in an optimal manner, it is of great importance that the building systems function properly. Ipero, in cooperation with the management organisation, prepared and implemented several renovations and improvements. Hereby, the combined […]

Read more

“Realisation of ambition begins with thorough investigation” Pier C at Schiphol airport is one of the piers in plan to be renovated. The requirements for this plan are that climate comfort and energy performance improve significantly while passenger handling be kept running throughout the renovation. Iperó and Merosch established a comprehensive integrated concept study with […]

Read more

“The complete standardisation of a power plant requires in-depth knowledge.” There are many benefits to standardising installations. Failure costs decrease, construction time is greatly reduced and commissioning is a piece of cake. Management is also simplified due to each installation being composed according to the same concept and controlled by the same control strategy. To […]

Read more

“Complex calculation method leads to clear insight in energy usage” How do you get more than 200 meters of energy and water shared in a flawless and transparent manner among some 60 tenants? It was time to turn Ipero. An energy registration system was developed for building complex Atlas Arena Amsterdam. Within this system, controls […]

Read more

“The systems need replacing while continuing to run at the same time” Replacing the air conditioning systems of F-pier was the moment to preserve the overall energy concept. Ipero worked out the plans. The latest technology was used for ventilation, temperature levels were adjusted and measurement and control were standardised. The result: lower investment costs […]

Read more