“Design scrutinised” The intention was to make primary school Brekeldschool energy efficient. A design for an installation including an air/water heat pump was already prepared. This was expected to yield low energy consumption. Ipero was asked to review the draft. Despite the system being small, many mistakes were found in the design presented. Ipero offered […]

Read more

“Working together for an effective power plant” The installation of a plant design for the residential care center in Transwijk was to be implemented by Losser. However, there was doubt over the correctness of design. Ipero was therefore asked for a second opinion. Analyses soon revealed that false assumptions and incorrect hydraulic design were at […]

Read more

“Cooperation leads to significant energy savings” Triodos Bank is one of the most sustainable banks in the world. An advisory party was to replace, renovate and maintain the facilities sought for the locations in Zeist. The goal: to improve climate comfort in the buildings and reduce energy consumption. Ipero signed on for the assignment. Ipero, […]

Read more

“The solution lies off the beaten track” Complaints were rampant at the swimming pool in Bodegraven regarding the quality of their indoor environment. Ipero was asked to give a second opinion, and the source of the problem appeared to lie with the newly installed air handling systems. These systems were equipped with heat pumps and […]

Read more

“The complete standardisation of a power plant requires in-depth knowledge.” There are many benefits to standardising installations. Failure costs decrease, construction time is greatly reduced and commissioning is a piece of cake. Management is also simplified due to each installation being composed according to the same concept and controlled by the same control strategy. To […]

Read more

“Critical attitude leads to better design” Rozet is the centre for culture, knowledge and education in Arnhem. The building must comply with the ambition to be one of the most sustainable buildings in Arnhem. Therefore, Ipero was requested to give a second opinion on the plant design. It soon became clear that there was insufficient […]

Read more

“A tangle of problems requires an integrated approach” A problem can have many causes. This also applies to the groundwatersystem for DeMix Fitness Almere. Ipero was asked to give a second opinion and discovered the cause: hydraulic setup errors and incorrect software assumptions made by the building’s management. Ipero went to work on the installer and […]

Read more

“Climate comfort complaints are history and energy consumption has drastically fallen” The courthouse in Bergen op Zoom laid the following problem on the table for Ipero: complaints poured in about indoor temperature. An inspection of the system revealed that the concrete core, heat pump and groundwatersystem did not work well together. After restoring the system, comfort […]

Read more