“Working together for an effective power plant”

The installation of a plant design for the residential care center in Transwijk was to be implemented by Losser. However, there was doubt over the correctness of design. Ipero was therefore asked for a second opinion. Analyses soon revealed that false assumptions and incorrect hydraulic design were at hand.

In cooperation with Losser, the design was adapted and implemented. The software, among other things, was fully tested by Ipero. Due to Ipero’s provision of assisitance in the management of the power plant, cooperation continues.