“Working together for an effective power plant” The installation of a plant design for the residential care center in Transwijk was to be implemented by Losser. However, there was doubt over the correctness of design. Ipero was therefore asked for a second opinion. Analyses soon revealed that false assumptions and incorrect hydraulic design were at […]

Read more

“Cooperation leads to significant energy savings” Triodos Bank is one of the most sustainable banks in the world. An advisory party was to replace, renovate and maintain the facilities sought for the locations in Zeist. The goal: to improve climate comfort in the buildings and reduce energy consumption. Ipero signed on for the assignment. Ipero, […]

Read more

“The solution lies off the beaten track” Complaints were rampant at the swimming pool in Bodegraven regarding the quality of their indoor environment. Ipero was asked to give a second opinion, and the source of the problem appeared to lie with the newly installed air handling systems. These systems were equipped with heat pumps and […]

Read more

“The complete standardisation of a power plant requires in-depth knowledge.” There are many benefits to standardising installations. Failure costs decrease, construction time is greatly reduced and commissioning is a piece of cake. Management is also simplified due to each installation being composed according to the same concept and controlled by the same control strategy. To […]

Read more

“Critical attitude leads to better design” Rozet is the centre for culture, knowledge and education in Arnhem. The building must comply with the ambition to be one of the most sustainable buildings in Arnhem. Therefore, Ipero was requested to give a second opinion on the plant design. It soon became clear that there was insufficient […]

Read more

“Extensive optimisation requires an integrated approach” The Public Psychiatric Care Centre in Geel (OPZ Geel) allowed the realisation of a central thermal storage system with locally placed heat pumps for its buildings from the Division of Rehabilitation. After unsuccessfully attempting to control the indoor climate for several years, it was time for action. Ipero conducted […]

Read more

“A cricial role in design, building, and after care” Ipero actively participates in many project phases. For example, the development of a sustainable heat and cold storage plant for Traffort Town Hall in Manchester. Ipero assessed the designs for building installation and power and guided where needed. During the execution, Ipero performed checks and tested […]

Read more

“A tangle of problems requires an integrated approach” A problem can have many causes. This also applies to the groundwatersystem for DeMix Fitness Almere. Ipero was asked to give a second opinion and discovered the cause: hydraulic setup errors and incorrect software assumptions made by the building’s management. Ipero went to work on the installer and […]

Read more

“Climate comfort complaints are history and energy consumption has drastically fallen” The courthouse in Bergen op Zoom laid the following problem on the table for Ipero: complaints poured in about indoor temperature. An inspection of the system revealed that the concrete core, heat pump and groundwatersystem did not work well together. After restoring the system, comfort […]

Read more